Step 1
Ensure the handle is in the upright (off) position.
Step 2
Align the two coupler lugs with the corresponding openings in the keg valve.
Step 3
Insert the keg coupler and turn clockwise to engage into position. (About 90 degrees)
Step 4
Press the handle downward (on). This will allow gas to enter the keg and beer to flow out of the keg.
Step 5
Now open the faucet and draw beer. Pump only while the faucet is fully open and pouring beer. Always open the faucet full and never half way.